| Terbitan | Judul | |
| Vol 1, No 1: Februari 2026 | AN ANALYSIS OF THE EFFECTIVENESS OF JOB SAFETY ANALYSIS (JSA) IMPLEMENTATION IN SUBSTRUCTURE CONSTRUCTION WORK | Sari PDF |
| Nadila Triwulandari, Katarina Rini Ratnayanti | ||
| Vol 1, No 1: Februari 2026 | ANALYSIS OF THE IMPACT OF AT-GRADE RAILWAY CROSSINGS ON THE PERFORMANCE OF THE GEDEBAGE SELATAN–GEDEBAGE UTAMA INTERSECTION IN BANDUNG CITY USING PKJI 2023 AND PTV VISSIM | Sari PDF |
| Bastian Dwi Yudapraja, Sofyan Triana | ||
| Vol 1, No 1: Februari 2026 | COMPARISON OF POWER HOUSE STRESS RATIOS IN MOROWALI USING ELM AND DAM METHODS | Sari PDF |
| Prima Adhiyasa, Matthew Nabil Ayal | ||
| Vol 1, No 1: Februari 2026 | COST BUDGET ESTIMATION OF A FOUR-STORY REINFORCED CONCRETE BUILDING USING BUILDING INFORMATION MODELING (BIM) | Sari PDF |
| Tusril Nabilah, Katarina Rini Ratnayanti | ||
| Vol 1, No 1: Februari 2026 | CYCLE TIME OPTIMIZATION FOR SIGNALIZED INTERSECTION PERFORMANCE USING PKJI 2023 AND PTV VISSIM: A CASE STUDY OF THE JL. IR. H. JUANDA–SILIWANGI INTERSECTION, BANDUNG CITY | Sari PDF |
| Aldi Maulana Gustori, Sofyan Triana | ||
| Vol 1, No 1: Februari 2026 | DRAINAGE PLANNING AND PUMP OPTIMIZATION IN THE SAYUNG INDUSTRIAL AREA, DEMAK REGENCY | Sari PDF |
| Muhammad Reza Nurfauzan, Fachrul Madrapriya | ||
| Vol 1, No 1: Februari 2026 | EVALUATION OF FIRE PROTECTION SYSTEMS AND EVACUATION TIME ESTIMATION USING PATHFINDER IN BUILDING X | Sari PDF |
| Muhammad Alghazali, Katarina Rini Ratnayanti | ||
| Vol 1, No 1: Februari 2026 | FIRE MITIGATION STUDY AND EVACUATION TIME PERFORMANCE IN EDUCATIONAL BUILDINGS IN BANDUNG CITY | Sari PDF |
| Muhammad Faqih Abdurrahman, Katarina Rini Ratnayanti | ||
| Vol 1, No 1: Februari 2026 | HYDROLOGICAL EVALUATION OF WMP 48 ST CAPACITY AT THE SAMBARATA COAL MINE | Sari PDF |
| Ilham Ilham, L.B.B. Prasetyo | ||
| Vol 1, No 1: Februari 2026 | PERFORMANCE ANALYSIS OF THE TAMANSARI ROAD - SULANJANA ROAD NTERSECTION IN BANDUNG CITY USING PTV VISSIM SOFTWARE | Sari PDF |
| Dikry Nafsi Subagja, Sofyan Triana | ||
| Vol 1, No 1: Februari 2026 | PERFORMANCE EVALUATION OF PUBLIC TRANSPORT INTEGRATION FACILITIES AT BANDUNG RAILWAY STATION | Sari PDF |
| Rifqi Martin Abdul Hakim, Sofyan Triana | ||
| Vol 1, No 1: Februari 2026 | SELF-COMPACTING LIGHTWEIGHT CONCRETE WITH PARTIAL SUBSTITUTION OF PUMICE STONE AS COARSE AGGREGATE AND DIATOMITE AS CEMENT REPLACEMENT | Sari PDF |
| Erland Muthahhari Irawan, Bernardinus Herbudiman | ||
| Vol 1, No 1: Februari 2026 | STRUCTURAL BEHAVIOR ANALYSIS OF A 6-STOREY REINFORCED CONCRETE BUILDING WITH VARIOUS TYPES OF SHEAR WALLS | Sari PDF |
| Risma Amelia, Euneke Widyaningsih | ||
| Vol 1, No 1: Februari 2026 | STUDY ON SILICA FUME VARIATIONS IN REACTIVE POWDER SELF COMPACTING CONCRETE (RPSCC) | Sari PDF |
| Nuanchary Cahyah Supriyadi, Bernardinus Herbudiman | ||
| Vol 1, No 1: Februari 2026 | UTILIZATION OF SUGARCANE MOLASSES WASTE OF 0.3% PLUS 0.15% OF CEMENT WEIGHT AS A RETARDER IN CONCRETE | Sari PDF |
| Agip Rahmat Muharam, Bernardinus Herbudiman | ||
| 1 - 15 of 15 Item | ||
