Analisis Pengaruh Kerja Lembur terhadap Produktivitas Tenaga Kerja Konstruksi pada Pekerjaan Struktur Bawah

Wanda Kurniawan, Afrizal Nursin

Sari


ABSTRAK

Produktivitas tenaga kerja merupakan salah satu faktor penentu keberhasilan sebuah proyek. Salah satu cara untuk mempercepat durasi proyek dengan menerapkan jam kerja lembur. Tujuan penelitian untuk menjabarkan produktivitas pada jam kerja normal dan lembur serta faktor yang mempengaruhi produktivitas lembur. Metode pengumpulan data dilakukan dengan pengamatan di lapangan. Hasil penelitian didapatkan produktivitas pekerjaan tiang pancang jam normal 3,489 m'/manhours dan 3,941 m'/manhours jam lembur; produkivitas pekerjaan pembesian capping beam pada jam normal 8,610 kg/manhours dan 12,415 kg/manhours jam lembur; pekerjaan bekisting jam normal 0,462 m²/manhours dan 0,763 m²/manhours jam lembur; pekerjaan pengecoran normal  0,170 m³/manhours. Performa proyek dihitung menggunakan rumus indeks produktivitas dan menghasilkan angka > 1 artinya cukup baik, pekerjaan pengecoran memiliki performa yang kurang baik karena nilai indeks produktivitas < 1. Hasil kuesioner menggunakan metode RII didapatkan sepuluh faktor yang mempengaruhi produktivitas lembur pada struktur bawah, diantaranya variabel faktor lingkungan, pengalaman kerja, metode kerja, keselamatan kerja dan variabel material dan alat.

Kata kunci: kerja lembur, kerja normal, produktivitas, relative importance index

 

ABSTRACT

Labor productivity is one of the determining factors in the success of a project. There is one way to accelerate the project forward is to apply overtime hours. This research intends to describe the productivity during normal working hours and overtime hours, as well as the factors that affect the overtime productivity. The method of data collection was carried out by site observations. The results of the research on the productivity of pile work at normal hours are 3.489 m'/manhours and 3.941 m'/manhours at overtime hours, the productivity of reinforcing capping beam work at normal hours is 8.610 kg/manhours and 12.415 kg/manhours at overtime hours, formwork work normal hours is 0.462 m²/manhours and 0.763 m²/manhours of overtime hours, the normal rate is 0.170 m³/manhours. The project performance is calculated with the formulation of the productivity index and the result should be more than 1 (> 1), which means achieved is quite good. Casting work's performance is not really good enough, because the index number is less than 1 (< 1). The results of the questionnaire using the Relative Importance Index Method obtains ten factors that affect overtime productivity in lower structure, those are environmental factors variable, work experience, work methods, health and safety environment, as well as material and equipment variables.

Keywords: work overtime, normal work, productivity, relative importance index


Teks Lengkap:

PDF


DOI: https://doi.org/10.26760/rekaracana.v7i2.108

Refbacks

  • Saat ini tidak ada refbacks.


____________________________________________________________

ISSN (elektronik) : 2477-2569  

diterbitkan oleh :

Teknik Sipil Institut Teknologi Nasional Bandung

Alamat :  Jl. PHH. Mustofa 23 Bandung 40124

Kontak : Tel. 7272215 (ext. 206)  Fax. 7202892

____________________________________________________________

Terindeks:

 

research

____________________________________________________________

Statistik Pengunjung 

Flag Counter

Lihat Statistik Jurnal

Jurnal ini terlisensi oleh Creative Commons Attribution-ShareAlike 4.0 International License.

Creative Commons License