Studi Load Shedding pada Sistem Kelistrikan Pengeboran Minyak Lepas Pantai, Kasus di Perusahaan X

TRIWAHYU RUBIANTO, SYAHRIAL SYAHRIAL, WALUYO WALUYO

Sari


ABSTRAK

Perubahan beban yang signifikan pada sistem kelistrikan dapat menyebabkan suatu sistem berjalan diluar batas stabil, Sehingga stabilitas sistem pada sistem kelistrikan sangat diperlukan, hal itu merupakan tujuan dilakukannya pembahasan kasus ini. Untuk menanggulangi suatu sistem agar mencapai kestabilan tersebut dilakukan proses load shedding dengan mengambil beberapa contoh asumsi menggunakan software simulasi dengan setting batas kerja UFR pada sistem untuk melakukan load shedding yang ditujukan jika terjadi perubahan frekuensi diluar batas standar perusahaan, dengan cakupan analisa pada saat generator load flow beban normal, saat kondisi pemasukan beban terbesar yaitu 1500HP, dan saat salah satu generator mengalami trip di t=1s dalam rentang waktu simulasi 100s, dengan melihat kinerja sistem dari sisi speed generator, perubahan frekuensi dengan melihat standar frekuensi yang diperbolehkan dengan rujukan dari pelepasan beban dari ANSI/IEEE C37 106-1987 dan perubahan tegangan dengan standard dari perusahaan adalah ±10%. Hasil yang didapatkan saat GTG trip, UFR bekerja di 58,5Hz dan 58,2Hz dengan total pelepasan beban sebesar 2727,25Kw, dan steady state pada t=80,011s.

Kata kunci : Stabilitas sistem, Pengeboran minyak lepas pantai, Load Shedding.

ABSTRACT

In the Electrical System often occurs a change in load can cause a system goes beyond the limit of stability, because about that the stability system is important, so that the stability system must be need to be explain in here. To make system back to stabil, the load shedding can be use by taking a few examples of assumption with simulation is used software include setting UFR to make loadshedding work when GTG(01) collapse and frekuensi turn down. Desired results of this project used multiple data methods with the electrical systems associated look in to perform of synchronous generator, the system stability, and load shedding, that is doing by some case is reviewed the ability of generator at load flow condition normal, while the biggest load condition start is 1500HP, and while one generator having trip at t=1s in the 100s simulation period, and seen the response look at the performance of speed generator system, and changes frequency by looking at the standard frequencies allowed by referral from load shedding of ANSI/IEEE C37 106-1987 and for changing from voltage used company’s standard is ±10%. The result is, when GTG(01) collapse, then UFR will work at frequency 58,5Hz dan 58,2Hz with total final load shedding is 2727,25Kw, and steady state at time t=80,011s

Key word: Stability system, Load shedding, offshore.


Refbacks

  • Saat ini tidak ada refbacks.


ISSN : 2337-439X

Ketua Editor :

Dr. Waluyo, M.T.

Editor :

1. Dwi Aryanta, Ir., M.T.

2. Arsyad Ramadhan Darlis, S.T., M.T.

3. Andre Widura, S.T., M.T.

4. Hendi Handian Rachmat, ST., MT., Ph.D.

Administrator :

Yugo Senddy P.